Industrial Installation
Heavy machinery, conveyors, storage, process equipment — rigged, aligned, and load-tested.
- • Rigging & laser alignment (±0.05mm)
- • Structural steel & supports
- • Commissioning + load test
Mechanical Engineering • Kenya • NCA/EBK Licensed • From KES 85,000
End-to-end mechanical engineering services for process plants, fabrication shops and industrial equipment installations.
→ Preventive from KES 85k/mo per line — fixed-price install in 24h after audit
Is your line losing output to mechanical failures?
→ We cut unplanned downtime by 40% on maintained assets and hand over with 2-year workmanship warranty + KEBS docs.
Avg. reply 4.2h • 127 quotes last 30 days • No spam, just a proposal.

10+ yrs • 200+ installs • Insured • 2-yr warranty
Kenya’s manufacturing and milling lines don’t fail loudly — they fail quietly. A conveyor that jams for 7 minutes every hour, a bearing that runs 12°C hot, a pump that draws 3A over nameplate. At Thika Cloth Mills we measured 14% unplanned downtime that the production log called ‘minor stops’. In 4 weeks of laser alignment, bearing swaps and a spares kit, it became 3% and throughput rose 18% — same people, same shifts.
Dynatec’s mechanical team has done that 200+ times. We are NCA Category 3 (mechanical), EBK-licensed engineers and KETRB technicians who rig with certified slings, align with laser to ±0.05mm and hand over with an 87-page O&M and a CMMS already loaded with 124 PM tasks. You don’t chase subcontractors — you get one report, one invoice, one date.
Most Kenyan plants buy the machine right and install it wrong. A 75kW motor 0.5mm misaligned wastes 6% energy and halves bearing life. A belt over-tensioned by one turn cuts life 40%. We fix the install, then protect it with spares kitting so you don’t wait 3 weeks for a DHL bearing.
The real cost isn’t the broken part — it’s the hidden cost. A flour mill losing 45 minutes per shift at KES 80,000/hour in lost output burns KES 1.2M per week without a single breakdown ticket. A cement conveyor running 8°C over limit shortens bearing life from 36 months to 14 months. In our Ruiru audit, 68% of ‘normal’ stoppages were actually correctable installation errors — alignment, tension, lubrication interval, or piping support spacing. Fix the install once, and the maintenance budget drops 22% year-over-year because you stop air-freighting emergency spares.
We don’t bid to be cheapest. We bid to be auditable. Every mechanical install leaves Ruiru with a material trace file: KEBS D-mark mill certs for steel, 6G welder certs, NDT (MPI/DPI) reports, pressure test logs to 1.5× design, laser alignment printouts, vibration baseline (0.8 mm/s) and thermography at 110% load. When NCA or your insurer visits, you hand them a file — not a story. That’s why Thika, Bamburi, and Bidco keep renewing: we make them look good in front of auditors.
If you run conveyors, elevators, hammer mills, sifters, mixers, boilers, compressors, pumps, tanks, or hydraulics in Nairobi, Thika, Athi River, Nakuru, Mombasa or Kisumu — we already stock your next bearing. SKF/FAG/NTN in Ruiru, not in a catalogue. A 6314 bearing at 2am is not a procurement problem; it’s a shelf pick. That’s the difference between 3 weeks and 3 hours.
You don’t need another contractor. You need a partner who knows that a KES 3,200 bearing can stop a KES 2.1M/day line, and who kits it before it fails. That’s Dynatec mechanical.
200+ installs, 10+ years, Ruiru warehouse with SKF/FAG stock — your bearing is not 3 weeks away
Laser alignment, vibration and thermography on every handover — not a receipt, a 12-page report
Spares kitting: we audit your line, kit 6 months of critical spares, label and shelve — emergency 24h from Ruiru
Training in Swahili/Sheng: operators do daily checks, artisans do alignment — we log it for your OSHA file
Fixed-price in 24h after audit — scope, spares, timeline and 2-year warranty in writing, zero ‘provisional sums’
Insured, licensed, safety-briefed — LOTO, toolbox talk, permit to work, every single time
If your line stops are ‘normal’, they’re not. They’re an install problem hiding as a maintenance problem. Let us audit 1 line in 1 day — you’ll see the 7 stops you stopped calling stops. Reply in 4.2 hours.
How It Works — No Surprises
01
We walk your line with your artisan and operator, log every asset (tag, photo, nameplate), measure alignment with laser, vibration with Fluke 810, temperature with FLIR, and energy with clamp. You get a 12-page photo audit, not a verbal quote. 1 day, no production stop.
02
Scope, GA drawings, spares kit (6-month), timeline (Gantt), manpower, and warranty (2-year workmanship) — all in writing. No ‘as per site’, no provisional sums. You approve, we mobilize in 72h.
03
Rigging with certified slings/chain blocks, laser alignment ±0.05mm, piping/structural with 6G weld + NDT (MPI/DPI), pressure test 1.5×, supports at correct spacing. EBK engineer on site, not on phone.
04
72-hour trial at 110% load, thermography and vibration baseline, punch list zero, handover pack (O&M 87 pages + CMMS 124 PM tasks loaded), toolbox training in Swahili/Sheng + register for your OSHA file. Then we stay — quarterly checks.
What We Do
Heavy machinery, conveyors, storage, process equipment — rigged, aligned, and load-tested.
Process & utility piping for water, steam, chemicals, compressed air.
Prevent breakdowns, extend life, keep spares ready.
Case Study
Challenge
14% downtime, 22-day backlog
Solution
Re-aligned 2 lines, replaced bearings, installed spares kit
Result
-72% downtime (14% → 3% in 4 wks), +18% throughput
| Factor | Dynatec | Freelance / Import | In-house |
|---|---|---|---|
| Response | 24–48h, Nairobi + mobile teams | 1–2 weeks, freelance | Limited spares |
| Warranty | 2 years workmanship | None | — |
| Docs | KEBS, NDT, O&M manual | Receipt only | Ad-hoc |
Pricing Guidance
Preventive contracts from KES 85k/month per line. Fixed-price install quotes in 24h after audit. Spares kit included.
Get Your Fixed PriceSite audit free within Nairobi metro for contracts >3 months.
Why You Called Us
These aren’t “occasional issues”. They’re the weekly cost you stopped counting. Each one has a KES value hidden in your bill, your stops log, or your audit file. We make it visible in the 1-day audit, then remove it.
Conveyors jamming, belts snapping, rollers seizing — weekly micro-stops that kill OEE
Bearings overheating, seals leaking, gearboxes growling — vibration you feel but don’t measure
Energy bill spiking 15–30% on old drives — motors drawing over nameplate, VFDs not tuned
Spares arriving late, wrong spec, no warranty — 3-week DHL that stops a 75kW line
NCA audit findings on rigging, alignment, or welding docs — no NDT, no mill certs, no O&M
Fabrication rework — piping leaking at 4 bar, supports cracking, tanks weeping
Deep Dive — The Work Behind the Promise
We don’t guess alignment — we laser it. A 90kW hammer mill 0.3mm out at coupling shortens bearing L10 life from 40,000h to 18,000h. Our PRUFTECHNIK laser hits ±0.05mm and we log it. Rigging is with certified slings (5-ton WLL), chain blocks, and beam clamps — not ropes and hope. Every lift has a lift plan and toolbox talk.
Commissioning is 72h at 110% with vibration (≤4.5 mm/s) and thermography (ΔT ≤10°C) logged hourly. Punch list is zero before we leave. You get a handover pack that your next auditor will love: alignment printout, vibration baseline, thermography, O&M, spares list, and CMMS tasks pre-loaded. That’s not extra — it’s standard.
Process water at 6 bar and steam at 8 bar don’t forgive bad welds. Our welders are 6G certified, procedure qualified (WPS/PQR), and every butt weld on carbon/stainless is MPI or DPI tested. Supports are spaced to BS 3974 — not ‘where it fits’. HDPE is butt-fused with traceable heater plates.
Hydro test is 1.5× design for 30 minutes, with chart recorder. Stainless passivation and PWHT where spec demands. You get mill certs (3.1), NDT reports, and pressure logs — not a receipt that says ‘piping done’. In Thika, that file passed KEBS first time; the previous contractor’s didn’t.
Reactive maintenance is 3–5× preventive in Kenya — not because labor is expensive, but because downtime is. A seized gearbox at 2am costs KES 2.1M in lost output + air freight + supermarket penalty. A 30-minute vibration check would have flagged it 3 weeks earlier (bearing frequency 3.2× RPM).
We do preventive with teeth: weekly vibration, quarterly thermography, oil analysis via lab (ISO 4406), and laser alignment on every swap. Spares are kitted before they’re needed — filters, belts, bearings, seals — labeled on your shelf, managed in CMMS. Monthly report: MTBF, MTTR, availability, next 30-day plan. When MTBF rises 14→19 months, you know PM is working — not just scheduled.
What You Get at Handover — No “We’ll Send Later”
12-page photo audit + EBK-stamped GA/drawings where required
Fixed-price proposal (scope + spares kit + timeline + warranty) in 24h
Licensed, insured crew — EBK engineers, KETRB technicians, 6G welders
6G welding + NDT (MPI/DPI) + pressure test 1.5× + laser alignment ±0.05mm
Vibration baseline + thermography at 110% + 72h trial log
87-page O&M manual + CMMS (124 PM tasks) + spares kit (6-month) + training register
In Thika, that handover file passed NCA with zero observations. The previous contractor’s “handover” was a receipt and 5 audit findings. Which file do you want to hand your boss on day 23?
Where We Do It — From Ruiru to Kwale
Hammer mills, roller mills, sifters, conveyors, elevators — dust, vibration, 24h shifts. Thika: 14%→3% downtime.
Conveyors, crushers, ball mills, silos, dust collectors — heavy, abrasive, hot. Bamburi pattern.
Mixers, pasteurizers, bottling, CIP piping — hygiene, stainless, audit. Bidco pattern.
Presses, extruders, packaging, utilities — OEE 88% after Dynatec.
Also: Nairobi, Thika, Athi River, Nakuru, Mombasa, Kisumu, Eldoret, Nanyuki — 24h audit in Nairobi metro, 72h nationally. Spur Mall, Ruiru — Ruiru warehouse, 3 mobile teams.
The Maths — What It Saves, What It Returns
A packaging line at 30 tonnes/hour, 18% throughput gain = 5.4 tonnes/hour extra. At KES 4,500/tonne margin, that’s KES 24,300/hour — KES 291,600 per 12-hour shift. Even 50% of that dwarfs our KES 85k/month PM. Clients see 2.7× return in year one before counting energy (-6% on aligned motors) and spares (-22%).
Downtime math: 14% → 3% on a line running 20h/day = 2.2 hours/day recovered. At KES 80k/hour lost output, that’s KES 176k/day — KES 5.28M/month. Our fixed-price install paid for itself in 11 days in Thika. That’s why we audit for free in Nairobi metro for contracts >3 months — the numbers sell themselves.
We audit free in Nairobi metro for contracts >3 months because the numbers sell themselves. You’ll see the KES value of the 7 stops you stopped counting — on paper, before you pay.
What They Say — After We Left
“We thought stops were normal. Dynatec showed us 7 stops per hour we stopped counting. 4 weeks later, 3% downtime and 18% more flour. They handed us a file NCA praised — not a receipt.”
Plant Manager — Thika Cloth Mills — Flour Mill, Thika
2-year workmanship warranty on installs, 6 months on overhauls, with thermography and alignment reports. If alignment drifts beyond ±0.05mm in warranty, we realign free. If a kitted spare is not on your shelf when needed, we dispatch from Ruiru in 24h at our cost.
NCA Category 3 • EBK-licensed • EPRA Class A • KEBS • OSHA 2007 • Insured • 10+ years • 200+ installs • Avg reply 4.2h • 127 quotes last 30 days • Ruiru HQ, Spur Mall.
You’ll get photos, not a pitch — and a fixed price in 24h with spares, timeline, and warranty. No provisional sums. No “we’ll send docs later”.
FAQ
Answers that unblock your purchase order.
Preventive contracts start at KES 85k/month per line (inspections, lubrication, minor spares). Major overhauls are quoted after audit — typically 15–25% less than breakdown cost. We provide a 24h fixed-price proposal.
Yes — NCA Category 3 (Mechanical & Electrical), EBK-licensed engineers, and KETRB technicians. We handle NCA audit docs and KEBS material certs for you.
We kit critical spares (bearings, seals, belts) for your line and hold them in Ruiru. Emergency spares dispatched in 24h.
2-year workmanship warranty on installs, 6 months on overhauls, with thermography and alignment reports at handover.
Get a fixed-price, audit-backed proposal for mechanical engineering — reply in 4.2h average.