+254 143 293 534

Electrical Engineering • Kenya • NCA/EBK Licensed • From KES 45,000

Electrical Engineering that kills KPLC penalties & blackouts

Certified electrical engineering for power distribution, motor control and energy efficiency in industrial facilities.

Electrical audit from KES 45k — genset + ATS from KES 1.2M (80kVA) with 1-year service

Trips, spikes, or generator failing when you need it?

  • Phase imbalance, hot panels, recurring trips
  • Generator not syncing, ATS failing
  • Power factor penalties from KPLC
  • No thermography or compliance report for audit

We stabilize your power, cut penalties, and pass KEBS/NCA first time — with 24/7 standby for breakdowns.

Avg. reply 4.2h • 127 quotes last 30 days • No spam, just a proposal.

Electrical Engineering

10+ yrs • 200+ installs • Insured • 2-yr warranty

A hot panel doesn’t announce itself. It just runs 68°C, then trips at 2pm, then takes your PLC with it. In Athi River we found a 48Ω earth (need ≤5Ω), a neutral at 18A on a 10A cable and zero RCDs on a 30mA board — all ‘passed’ visually. One week: earthing 3.2Ω, PFC 150kVAR, 18 MCBs resized, 12 RCDs added. Penalties KES 120k/mo → 0, outage zero since, 32% energy saving on the 7-day log.

Dynatec is EBK and EPRA licensed, NCA Electrical, IEEE & BS 7671. We don’t just pull cable — we do load studies, 7-day logs, thermography and EBK stamps so you pass KEBS/NCA first time (95% pass rate). And we stay — 24/7 standby, 4h response for contract clients in Nairobi metro.

Kenya Power doesn’t forgive power factor. Neither does an arc flash. We fix both. Most plants oversize the genset and throttle, or buy PFC and never tune it. We right-size, then prove it under load.

The bill tells the truth. In our audits, 61% of factories in Nairobi Industrial Area pay 20–35% in KPLC power factor penalties they call ‘fixed cost’. It isn’t fixed — it’s a KES 90k–150k/month donation to KPLC for a 150kVAR capacitor bank you should have tuned. We log for 7 days, size PFC to 0.96 lagging, and guarantee penalty removal in writing. Most clients pay back the PFC in 4–7 months, then bank 30%+ savings every month after.

Safety is not a sticker. A 68°C hot spot on a 100A MCCB is 27°C over ambient — 2× the 10°C limit before you de-rate or replace. A neutral at 18A on a 10A cable is a fire in slow motion. We thermograph every joint under load, megger every cable (>100MΩ), test every RCD (30mA in 40ms), and log earthing quarterly (≤5Ω, we hit 3.2Ω in Athi). You get test certs, not a photo of a panel.

Backup is not a generator — it’s a sequence. ATS that takes 22 seconds instead of 8 seconds is 14 seconds of PLC reboot and product scrap. We do AMF/ATS sync in 8s, test under load with load bank, and failover drill at 2am if you want. Fuel, battery, coolant — we checklist it. When mains fails at 11:47pm, you don’t call us — it just works. That’s why Athi has had zero outage since install, and why their insurer cut premium 12%.

You don’t need more cable. You need the right cable, the right breaker, the right earth, and a file that makes KEBS nod. That’s Dynatec electrical — EBK-stamped, EPRA-licensed, load-proven, and on standby when you need us.

Load study + 7-day log before we quote — no guessing, no oversizing, guaranteed penalty removal

EBK-stamped single-line + thermography on every handover — you get a file, not a photo

Sync gensets under load (AMF/ATS 8s) — we test with load bank, not just wire and hope

24/7 standby, 4h response — we don’t leave after energization, we stay for quarterly thermography

Fixed-price after audit — cable sizing per BS 7671 derating, PFC tuned, earthing ≤5Ω in writing

95% first-time KEBS/NCA pass — we’ve done it 200+ times, your audit is not our rehearsal

If your penalty line on the KPLC bill is not zero, you’re paying for our audit. Let us log 7 days — we’ll show you the PFC you should have bought, and we’ll guarantee the saving in writing.

How It Works — No Surprises

From audit to handover in 4 steps

01

Log for 7 days — see it on paper

Clamp every phase at MCC/PCC (3-phase loggers), harmonic analysis, PF, earth (fall-of-potential), and thermography. You get a 15-page load report with graphs — neutral current, hot spots, PF by hour, earth value. No opinions, just data.

02

Design & stamp — EBK, BS 7671

EBK single-line, cable sizing with derating (temp, grouping, depth), PFC sizing to 0.96, MCC/PCC spec, earthing design (rods + mat + chem if rocky), protection coordination (MCB/MCCB type, RCD 30mA). Stamped, logged, filed.

03

Install & test — every joint, every cable

MCC/PCC/PFC/earthing/genset/ATS — installed by EPRA Class A electricians, megger, polarity, RCD, earth loop, thermography under load, load bank for genset (0–100% step). No energization without test cert.

04

Energize & stay — failover proven

Failover test under load (mains → genset 8s, back 5s), harmonics after PFC, training (LOTO, arc flash PPE, lockable isolators), 1-year service, quarterly thermography + earth test. Your file grows, not your risk.

What We Do

End-to-end electrical engineering — you don’t chase subcontractors.

Power Distribution

MV/LV, MCC, PFC, earthing — built to EBK standards.

  • 11kV/415V, MCC & PCC
  • Power factor correction
  • Earthing ≤5Ω, tested quarterly

Control & Automation

PLC, SCADA, VFDs — save 30–50% on motor energy.

  • Siemens / Allen-Bradley PLC
  • VFDs + soft starters
  • Energy audit + savings report

Backup & Safety

Generators, ATS, UPS, protection.

  • 50kVA–1MVA gensets
  • ATS/AMF sync
  • RCD 30mA + arc flash PPE

Equipment & Systems We Handle

Generators & ATS
MCC / PCC Panels
VFDs & PLCs
Transformers
Busbars & Cabling
Solar + Hybrid

Compliance Handled — You Pass First Time

EBK & EPRA licensedNCA ElectricalIEEE & BS 7671Thermography + test certs

Case Study

Power System Installation — Athi River

Challenge

Weekly outages, KPLC penalties KES 120k/mo

Solution

200kVA genset + ATS + PFC + earthing

Result

Zero outage since install, penalties 0, 32% energy saving

Read full case study →

How We Compare

FactorDynatecFreelance / ImportIn-house
DesignEBK stamped, load studyNo drawingsCopy-paste
TestingThermography + 7-day load logVisual only
Standby24/7, 4h responseNext weekAfter hours

Pricing Guidance

No hidden costs — fixed price in 24h

Electrical audits from KES 45k. Installs quoted after load study — genset + ATS from KES 1.2M (80kVA) with 1-year service.

Get Your Fixed Price

Site audit free within Nairobi metro for contracts >3 months.

Why You Called Us

If any of these sound familiar, we’ve seen it 200+ times — and fixed it.

These aren’t “occasional issues”. They’re the weekly cost you stopped counting. Each one has a KES value hidden in your bill, your stops log, or your audit file. We make it visible in the 1-day audit, then remove it.

!

KPLC power factor penalties 20–35% of bill — paying KES 120k/mo for a capacitor you don’t tune

!

Phase imbalance, hot MCCBs (68°C), recurring trips — thermal runaway you can’t see

!

Generator not syncing, ATS 22s, neutral overloaded — backup that fails when you need it

!

Earthing 48Ω (need ≤5Ω) — shock, PLC damage, and KEBS fail

!

No thermography, no test certs, no single-line — audit findings and insurer pushback

!

Motors throttling, no VFDs — 30–50% energy wasted on DOL starts

Deep Dive — The Work Behind the Promise

Not brochure copy. The actual work we do — so you know what “done” looks like.

01Power Distribution — MV/LV, MCC, PFC, Earthing

We size for Kenya, not for catalogue. Ambient 30°C, grouping on cable tray, derating per BS 7671 Table 4C1 — a 95mm² cable on a tray with 6 others at 40°C is not 95mm² anymore; it’s 68mm² effective. We derate, you don’t burn.

PFC is not a box — it’s tuning. Steps of 25kVAR, detuned reactors for harmonics (THD >15% needs 7% reactor), controller with PF target 0.96 lag. 150kVAR in Athi: penalty KES 120k→0, PF 0.78→0.96, current -22%, transformer headroom +18%. Earthing: rods + mat + chem (bentonite if rocky), test quarterly, target ≤5Ω, we achieved 3.2Ω. You get single-line EBK-stamped, cable schedule, PFC calc, and earth test — not a sketch.

02Control & Automation — PLC, SCADA, VFDs That Pay

A 37kW pump on DOL draws 6× inrush and runs 100% when you need 60%. Put a Danfoss/ABB VFD, add pressure PID, and you save 35–50% and soften starts — bearing life +30%. PLC (Siemens S7-1200/1500 or Allen Bradley CompactLogix) for interlocks, SCADA (WinCC/FactoryTalk) for trends, alarms, and OEE.

We don’t just program — we audit first. 7-day log shows which motors hunt, which run light, which trip on voltage dip. Energy audit + savings report: ‘Install 3× 22kW VFDs, save 18MWh/year, KES 540k/year, payback 9 months.’ Proven in Athi: 32% energy saving after PFC+VFD+correct sizing.

03Backup & Safety — Genset, ATS, UPS, and You Going Home Safe

Genset is not kVA — it’s load step, altitude (Nairobi 1,795m derates 10%), and sequence. 200kVA prime at 0.8 PF = 160kW, but step load 60% means you need 320kVA to avoid voltage dip >15% on motor start. We size with load bank steps 0–100%, test ATS 8s, and do mains-fail drills at 2am with your night shift.

Safety: RCD 30mA on 400V boards (40ms trip), RCBO where required, arc flash PPE Cat 2 (8 cal), lockable isolators, LOTO, and thermography every quarter. A 68°C breaker is not ‘warm’ — it’s 2× limit and we replace it before it arcs. That’s why zero LTI in 200+ energizations.

What You Get at Handover — No “We’ll Send Later”

A file, not a handshake. Your auditor will thank you.

7-day load log + earth + thermography report (15 pages, graphs)

EBK-stamped single-line + cable schedule + PFC calc + earthing design

MCC/PCC/PFC/earthing/genset/ATS installed by EPRA Class A electricians

Megger, polarity, RCD, earth loop, thermography under load, load bank test certs

ATS failover 8s proven under load + SCADA trends + O&M + training register

1-year service + quarterly thermography + 24/7 standby (4h response)

In Thika, that handover file passed NCA with zero observations. The previous contractor’s “handover” was a receipt and 5 audit findings. Which file do you want to hand your boss on day 23?

Where We Do It — From Ruiru to Kwale

Your industry, your dust, your shifts — we’ve done it.

Manufacturing

MCC/PCC, PFC, VFDs, genset sync — Thika pattern, 32% energy saving.

Cement & Mining

11kV, transformers, motor control, earthing in dust — 3 mobile teams.

Commercial & Healthcare

Distribution, lighting, UPS, emergency genset — silent, tested, compliant.

Energy & Utilities

Solar hybrid, metering, protection — 95% KEBS pass first time.

Also: Nairobi, Thika, Athi River, Nakuru, Mombasa, Kisumu, Eldoret, Nanyuki — 24h audit in Nairobi metro, 72h nationally. Spur Mall, Ruiru — Ruiru warehouse, 3 mobile teams.

The Maths — What It Saves, What It Returns

This is not cost. It’s avoided cost — with a 2.7× pattern.

PFC 150kVAR costs ~KES 900k installed. Penalty KES 120k/mo → 0 = payback 7.5 months. After that, it’s KES 1.44M/year saved, every year, 10-year life = KES 14.4M. Current efficiency 78% → 96% also cuts current 22%, so your 500kVA transformer gains 90kVA headroom — no KES 3M upgrade needed.

Genset + ATS 200kVA from KES 1.2M (80kVA) to KES 4.5M (200kVA) — but a single 4-hour outage at KES 120k/hour lost output = KES 480k. Two outages/month = KES 960k/month risk. Athi had 4 outages/month before — zero since. Even one prevented outage per quarter pays the service. And insurer? They cut premium when you show EBK drawings + test certs.

We audit free in Nairobi metro for contracts >3 months because the numbers sell themselves. You’ll see the KES value of the 7 stops you stopped counting — on paper, before you pay.

What They Say — After We Left

We paid KPLC KES 120k/month penalty and called it normal. Dynatec logged 7 days, sized PFC, and penalty went to zero in 30 days. Genset sync 8 seconds — we tested at 2am, it just worked.

Operations ManagerTwiga Cement — Athi River, Power System

Our Guarantee — In Writing, Not in Words

Penalty removal guaranteed in writing for PFC — or we tune free until it is zero. Earthing ≤5Ω guaranteed, or we add rods/mat at our cost. ATS 8s failover proven under load with load bank, or we replace ATS free. 1-year service + quarterly thermography included.

NCA Category 3 • EBK-licensed • EPRA Class A • KEBS • OSHA 2007 • Insured • 10+ years • 200+ installs • Avg reply 4.2h • 127 quotes last 30 days • Ruiru HQ, Spur Mall.

Seen enough? Let’s audit 1 line in 1 day — free in Nairobi metro.

You’ll get photos, not a pitch — and a fixed price in 24h with spares, timeline, and warranty. No provisional sums. No “we’ll send docs later”.

FAQ

Electrical Engineering — FAQ

Answers that unblock your purchase order.

Do you handle KPLC power factor penalties?

Yes — we audit, size PFC, and guarantee penalty removal. Most clients save 20–35% on power bills; we show savings in a 7-day load log.

Can you sync a generator to existing mains?

Yes — we do AMF/ATS sync, load sharing, and mains failure tests. We test under load and hand over with sequence report.

What about KEBS/NCA compliance?

We provide EBK-stamped drawings, test certs, and thermography for your NCA/KEBS file. First-time pass rate >95%.

Do you offer emergency call-out?

24/7 in Nairobi metro — 4h response for contract clients, next-day for ad-hoc. Call +254 143 293 534.

Stop Firefighting. Start Planning.

Get a fixed-price, audit-backed proposal for electrical engineering — reply in 4.2h average.