+254 143 293 534

Industry Focus • Mining

Mining — 98.1% Fleet Availability in Dust & Heat

For 100–340t excavators where 1% availability = KES 4M/month. We do 250h service in the pit, not in town.

Top pains we solve for Mining:

  • 340t fleet availability <90% — 3 unscheduled stops/week
  • Dust + vibration + heat — failures in 2 months, not 12
  • MSD compliance — 12 observations, no docs
  • PPE failures — boots delaminate, respirators leak
Mining

Services Tailored for Mining

Maintenance

250h in-pit service, 38 checks, 1.5h avg

Mechanical

hydraulics, undercarriage, ground engaging

PPE

P3 respirators, S3 boots, harnesses — fit-tested

Safety

MSD training + docs, LOTO, permits

Mining Act 2016OSHAMSD (Directorate)KEBS KS 2528

Featured Case Study for Mining

Industrial Maintenance (Mining)

Industrial Maintenance (Mining)

Ongoing preventive and corrective maintenance for a large mining operation, boosting uptime and reliability.

Read case study →

PPE Bundle for Mining

Pre-kitted for mining — KEBS certs, training, 7-day swap. From KES 8,200/kit (50+).

Build Mining Bundle

FAQ

Mining — FAQ

What is availability on maintained fleets?

98.1% on CAT 6040 (340t) with 250h PM + oil analysis (42 samples/90d). MTBF 140→310h, MTTR 8.2→3.1h. Measured.

Do you stock spares at Kwale?

Consignment at site: 2× final drives, 4× chains, filters, hoses — KES 8M, vendor-managed, 24h Ruiru→Kwale.

Need Mining Experts?

Get Fixed-Price Quote in 24h