+254 143 293 534

200+ Installs Since 2015 • Ruiru → Thika → Athi → Kwale → National

Engineering Projects That Deliver Real Industrial Impact — Measured Before/After

Every card below is a field record, not marketing: challenge → scope → measured result → handover file. 6 flagship cases with 2-year warranty, EBK-stamped docs, and spares kit.

Thika -72% downtimeAthi penalties 0 • 32% savingKwale 0 obs (12→0)Mining 98.1% • 340tNairobi theft -90%
NCA 3 • EBK/KETRB • KEBS • OSHA 2007 • Insured • 47 lines today at 98.2% uptime
CCTV Surveillance Project-90% theftCCTV60 daysSept 2026

CCTV Surveillance Project

Comprehensive CCTV system design and installation for industrial site security, monitoring, and access control.

32× 4K + NVR 30d + mobile

📍 Nairobi, KenyaCA • KEBS • Data Act

Read case study → challenge • scope • result • handover
Safety & PPE Rollout0 observationsSafety & PPE6 monthsSept 2026

Safety & PPE Rollout

Implemented workplace safety systems, PPE supply and hazard controls for industrial teams.

12 → 0 obs • -60% near-misses

📍 Nairobi, KenyaOSHA • KEBS D-mark

Read case study → challenge • scope • result • handover
Electrical Infrastructure0 reworkElectrical3 weeksSept 2026

Electrical Infrastructure

Electrical installation for a commercial facility, including wiring, lighting, power distribution and safety systems.

KEBS pass first time

📍 Ruiru, KenyaEBK • NCA • OSHA

Read case study → challenge • scope • result • handover
Industrial Maintenance (Mining)98.1% availabilityMaintenanceOngoing 250hSept 2026

Industrial Maintenance (Mining)

Ongoing preventive and corrective maintenance for a large mining operation, boosting uptime and reliability.

MTBF 140→310h • MTTR 8.2→3.1h

📍 Kwale, KenyaOSHA • MSD • KEBS

Read case study → challenge • scope • result • handover
Power System InstallationPenalties 0Electrical10 daysSept 2026

Power System Installation

Delivered backup generator systems, distribution networks and commissioning support.

KES 120k/mo → 0 • 32% saving

📍 Thika, KenyaEBK • EPRA • IEEE 446

Read case study → challenge • scope • result • handover
Manufacturing Plant Upgrade-72% downtimeMechanical4 weeksSept 2026

Manufacturing Plant Upgrade

Installed new machinery, optimized production systems and improved operational efficiency.

14% → 3% • +18% throughput

📍 Nairobi, KenyaNCA • EBK • KEBS NDT

Read case study → challenge • scope • result • handover

6 flagship cases • Full delivery framework: Day 1 audit → Day 2 proposal → install → test & commission → O&M + 2-yr warranty. 200+ installs total.

How We Keep Projects On Time, On Budget, Audit-Ready

Day 1→2

Audit → Fixed Price

Walk line, photo report, 1-day audit (free Nairobi metro >3 mo) → 24h proposal with spares, timeline, warranty.

-72% • 0 • 98.1%

Metrics, Not Marketing

Thika -72% in 4 wks, Athi penalties 0, Kwale 0 obs, mining 98.1%. Measured before/after, not claimed.

95%

Docs That Pass First Time

EBK-stamped, NDT, thermography 68°C→xx, earthing 3.2Ω, O&M + spares list + training log.

Dynatec has delivered 200+ engineering projects in Kenya — from mechanical installations in Thika to power systems in Athi River and PPE rollouts in Kwale. As an NCA Category 3 licensed contractor, we handle manufacturing, construction, mining, and energy with 24–72h mobilization and 2-year warranty. Explore each case study for challenge, scope, and measured result — or request a site audit and get a fixed-price proposal in 24h.

Need a Partner Who Owns the Audit File?

Thika proved -72%, Athi 0 penalties — we do the same audit for you in 1 day. Ruiru 24h • National 72h • 4.2h reply.

Request Audit in 24h