200+ Installs Since 2015 • Ruiru → Thika → Athi → Kwale → National
Engineering Projects That Deliver Real Industrial Impact — Measured Before/After
Every card below is a field record, not marketing: challenge → scope → measured result → handover file. 6 flagship cases with 2-year warranty, EBK-stamped docs, and spares kit.
-72% downtimeMechanical4 weeks • Mar 2024Manufacturing Plant Upgrade
Installed new machinery, optimized production systems and improved operational efficiency. 14% downtime → 3% in 4 weeks, +18% throughput.
14% → 3% • +18% throughput
📍 Thika Cloth Mills, Thika • NCA • EBK • KEBS NDT
Read case study → challenge • scope • result • handover
Penalties 0Electrical10 days • May 2024Power System Installation
200kVA genset + ATS + PFC + earthing. Zero outage since install, KPLC penalties 0, 32% energy saving.
KES 120k/mo → 0 • 32% saving
📍 Twiga Cement, Athi River • EBK • EPRA • IEEE 446
Read case study → challenge • scope • result • handover
0 observationsSafety & PPE6 months • Jul 2024Safety & PPE Rollout
Kitted 180 staff, trained, fit-tested. Zero OSHA observations in 6 months, near-misses -60%.
12 → 0 obs • -60% near-misses
📍 Kwale Mining Site • OSHA • KEBS D-mark
Read case study → challenge • scope • result • handover
98.1% availabilityMaintenanceOngoing 250h • Feb 2024Industrial Maintenance (Mining)
Heavy machinery servicing, 98.1% availability on 340t excavators.
MTBF 140→310h • MTTR 8.2→3.1h
📍 Kwale, Kenya • OSHA • MSD • KEBS
Read case study → challenge • scope • result • handover
-90% theftCCTV60 days • Jun 2024CCTV Surveillance Project
32 HD cameras + NVR + access control. Theft -90% in 60 days.
32× 4K + NVR 30d + mobile
📍 Nairobi Industrial Area • CA • KEBS • Data Act
Read case study → challenge • scope • result • handover
0 reworkElectrical3 weeks • Jan 2024Electrical Infrastructure
Commercial facility: wiring, lighting, distribution, safety systems.
KEBS pass first time
📍 Ruiru, Kenya • EBK • NCA • OSHA
Read case study → challenge • scope • result • handover6 flagship cases • Full delivery framework: Day 1 audit → Day 2 proposal → install → test & commission → O&M + 2-yr warranty. 200+ installs total.
How We Keep Projects On Time, On Budget, Audit-Ready
Day 1→2
Audit → Fixed Price
Walk line, photo report, 1-day audit (free Nairobi metro >3 mo) → 24h proposal with spares, timeline, warranty.
-72% • 0 • 98.1%
Metrics, Not Marketing
Thika -72% in 4 wks, Athi penalties 0, Kwale 0 obs, mining 98.1%. Measured before/after, not claimed.
95%
Docs That Pass First Time
EBK-stamped, NDT, thermography 68°C→xx, earthing 3.2Ω, O&M + spares list + training log.
Dynatec has delivered 200+ engineering projects in Kenya — from mechanical installations in Thika to power systems in Athi River and PPE rollouts in Kwale. As an NCA Category 3 licensed contractor, we handle manufacturing, construction, mining, and energy with 24–72h mobilization and 2-year warranty. Explore each case study for challenge, scope, and measured result — or request a site audit and get a fixed-price proposal in 24h.
Need a Partner Who Owns the Audit File?
Thika proved -72%, Athi 0 penalties — we do the same audit for you in 1 day. Ruiru 24h • National 72h • 4.2h reply.