+254 143 293 534

Industry Focus • Energy & Utilities

Energy & Utilities — Zero KPLC Penalties, 100% Uptime

For cement, milling, and water plants paying KES 120k+/mo in power factor penalties. We log, correct, and guarantee 0.

Top pains we solve for Energy & Utilities:

  • KPLC power factor penalties 20–35% — PF 0.78, no PFC
  • Genset not syncing — ATS fails, 8-min blackout, scrap
  • Hot panels 68°C, trips, neutral burn — no thermography
  • No earthing report — 48Ω (need ≤5Ω), audit fail
Energy & Utilities

Services Tailored for Energy & Utilities

Power

11kV/415V, PFC 150kVAR 6-step, earthing 3.2Ω (was 48Ω)

Backup

200kVA Perkins + AMF/ATS 8s sync, burn-in log

Maintenance

quarterly thermography + load balance

Safety

arc 8cal, LOTO, RCD 30mA

EPRAEBK (Lic. A)IEEE 446KEBS + Energy Act

Featured Case Study for Energy & Utilities

Power System Installation

Power System Installation

Delivered backup generator systems, distribution networks and commissioning support.

Read case study →

PPE Bundle for Energy & Utilities

Pre-kitted for energy & utilities — KEBS certs, training, 7-day swap. From KES 8,200/kit (50+).

Build Energy & Utilities Bundle

FAQ

Energy & Utilities — FAQ

Can you remove KPLC penalties?

Yes — 7-day log, PFC sizing, install, re-measure. Guarantee: penalties 0 in 30 days or we re-size free. Most save 20–35%.

Do you do earth testing?

3-point fall-of-potential, 3.2Ω cert. If >5Ω, we add rods + bentonite and re-test.

Need Energy & Utilities Experts?

Get Fixed-Price Quote in 24h